Building block sets have been distributed. An equivalent amount of modeling will be acceptable from something else.
The modeling should take 6 weeks, 2-4 hours per week
Accuracy of models will not be measured, but the more accurate the better
A Top-Level-Assembly along with drawings, exploded view, BOM will be submitted
All files will be submitted
If you have your own idea of something that will take the approximate amount of time, let me know and we can decide on a plan of action
Project 01
A 2D drawing of the single-most complicated part from your set
Fully Defined Drawing of your most complicated part
All interface dimensions should be defined. In the case of this arm, the hand socket and shoulder socket at a minimum should be dimensioned
Assembly drawing for your first sub-assembly
Isometric view of sub-assembly
BOM
Isometric Exploded View
Notes & Instructions on how to assemble
Alternate Part View
Top Level Assembly Drawing (including all parts)
Isometric view of top-level-assembly
BOM
Isometric Exploded View